ETHANOL PLANT
- Rectified successive bearing failures on dryer exhaust fan and prepared reliability program for fans in collaboration with David Hillis of Power Flow Inc. (click on Linkedin tab in the upper right corner and scroll down to projects)
- Prepared maintenance action plan to correct the structural and installation fan issues on site in order to deliver superior reliability and submitted it for review to the maintenance department
- Conducted equipment guarding survey and prepared corrective action plan
- Coordinated reconstruction project of hammer mill by modifying ducting layout, rectifying dust collector system and levelling mill
- Prepared maintenance procedure for electrical heat tracing
- Analyzed operational context and prepared contingency plan for loss of boilers